PROJECTS

Henry Hudson Bridge – Lower Deck Replacement

  • Client: MTA Bridges and Tunnels
  • Location: New York, NY
  • Project Value: $86,304,000
  • Time Frame: 21 months

Description:

This project involved replacing the lower level deck of the Henry Hudson Bridge while constantly maintaining traffic on the majority of the bridge.  Judlau replaced the entire lower level four-lane bridge deck as well as the northern approach structure.

The existing concrete deck  was replaced with a new steel grid deck, with cast-in-place infill and a 2” overfill riding surface.

Scope of Work included:

  • Structural steel repairs, upgrades and enhancements.
  • Installation of over 825 tons of structural steel.
  • Installed/replaced stringers, floor beams, beam supports and seismic retrofits.

Replacing the concrete-framed north approach involved a complex sequence of operations. Judlau had to maintain structural capacity to both the upper and lower levels of the structure, while replacing the concrete structure in stages. This involved partially installing the new structure within the existing one, and a multi-step jack / load transfer to support the upper level columns.

Related Projects

Rehabilitation of the Culver Line Viaduct

This project will repair and rehabilitate the Culver Line viaduct’s existing concrete deck. more info »

Reconstruction of Three Bridges

This project was spread out over three bridge locations, and involved three major highways. more info »

Rehabilitation of the Bruckner Expressway Bridges

This design-build project was divided into 2 distinct parallel bridges. more info »

Rehabilitation of Greenpoint Ave. Bridge

Judlau replaced the deteriorated deck in the bascule span of the bridge. more info »

Henry Hudson Bridge - Replace Curb Stringers & Lighting

Judlau is removing the unused sidewalk and replacing it with an extended deck. more info »