Judlau is removing the unused sidewalk and replacing it with an extended deck, providing a much needed roadway shoulder.  The above grade curb stringers, located on both sides of the bridge, will be removed and replaced with roadway stringers located beneath the deck.

Miscellaneous steel repairs will be performed to the existing fascia girders, columns and stringers, along with replacing select diaphragms, scupper supports and sign structures.  The entire UL electrical system for the roadway lighting will be replaced; conduits for the lighting, telephone and communication wiring will be placed inside the concrete barrier.  All modular and relief and expansion joints will be extended and bearing pads and support steel will be replaced.

Related Projects

Rehabilitation of the Culver Line Viaduct

This project will repair and rehabilitate the Culver Line viaduct’s existing concrete deck. more info »

Reconstruction of Three Bridges

This project was spread out over three bridge locations, and involved three major highways. more info »

Henry Hudson Bridge - Lower Deck Replacement

Judlau partially reconstructed the Henry Hudson Bridge over the Harlem River. more info »

Rehabilitation of the Bruckner Expressway Bridges

This design-build project was divided into 2 distinct parallel bridges. more info »

Rehabilitation of Greenpoint Ave. Bridge

Judlau replaced the deteriorated deck in the bascule span of the bridge. more info »